REQUISITION_DATE | NEEDED_BEFORE | PRIORITY | EMPLOYEE_NAME | SEGMENT_CODE | REMARK |
31/12/2023 | 31/12/2023 | Normal | Mahmoud Abdelaziz Yousef Sandouqa | 2023/16264 | Repairing of limestone bunker roof by installing new Cs sheet as a sealing roof with 4 mm thickness scope of work includes suppling of crane material scolding and manpower LUMB SUM contract the subcontractor must visit the site before sending the offer drawings will be submitted during site visit |
|
| |
| |
COST_CNTR | ITEM | ITEM_DESC | REMARKS | REQ_QTY | APRVD_QTY | UNIT | YTD_CONS | QTY_ON_HAND | REQ_ON_DELIVERY | TOTAL | MIN_QTY | MAX_QTY | REORDER | OPEN_PO |
POWER PLANT - MECH MAINT - PP LIMESTONE FEED SYSTEM | 95110000 | MAINTENANCE CONTRACT WORK | Repairing of limestone bunker roof by installing new Cs sheet as a sealing roof with 4 mm thickness scope of work includes suppling of crane material scolding and manpower LUMB SUM contract the subcontractor must visit the site before sending the offer drawings will be submitted during site visit | 1 | 1 | EA | 0 | 0 | 58353.25 | 14000 | 0 | 0 | 0 | 988410.25 |
|
| |
| |
| | | | | | |
* Note: To reset the PR check the checkbox then reject the task |
| | | | | |
| | | | | | |
| |
| | | | | |
| | | | | | |